Autumn 2020 · Building
Alexis Leignel
Building the installation
What they left behind
ReportPDF · 25 pages · 2 MBAlexis arrived when the equipment had been ordered but nothing was connected yet. His job was to turn a box of parts into a working installation. He fixed the SMA Sunny Boy inverters vertically on painted plywood boards (to keep the clearance they need to cool down), drilled the cable holes through the floor rather than the walls to protect the airtightness of the passive house, and built a small shed to protect the firefighter switches from the Bergen rain.
His main creation is the patching board, an idea worked out with Harald and Richard and inspired by old telephone switchboards. It lets students redirect each string of panels to an inverter or to the battery with plug-in cables. Alexis drew the plates in Autodesk Inventor for the plasma cutter, added colour-coded labels for teaching, and calculated which combinations of panels stay within the voltage and current limits of each device.
He wired the DC side and left a clear plan for the next steps: the AC side with an electrician, the Tigo monitoring devices, the flexible panels, a screen visible from the window, and a first sketch of a new logo.

